Tier 1/HWM
What is a High Water Mark (HWM)?
The amount of power a utility purchases from Bonneville Power Administration (BPA)
during a specified time period will be used to help set the High Water Mark (HWM) for
that utility. This HWM will set the amount of power a utility can purchase from BPA
at BPA’s low-cost rate (Tier 1).
Up until now, BPA has been able to provide enough generation to serve the needs of
utilities in the Northwest with the Federal based hydro system (FBS). Starting
October 1, 2010,
this low-cost source of power will no longer be adequate to serve all of our needs.
Rather than dilute the value of this low-cost resource, the BPA has decided to cap the
amount of power utilities can buy from this system. This low-cost hydro is referred to
in future rate cases as “Tier 1.” The HWM will define as a utility’s ability to buy
power at the Tier 1 rate.
When is the HWM determined?
The HWM will be based on each utility’s actual retail load for the period of October 1, 2009 through September 30, 2010.
How is OTECC’s HWM determined?
Once each utility’s load is determined, the HWM will be the ratio of OTECC’s load divided by the total load of all utility’s load multiplied by the total power available from the FBS.
What happens when we need more power than the HWM can provide?
If utilities need additional power, they must go into the marketplace and acquire it. BPA, as well as many other power providers will have Tier 2 products. (For a complete discussion of Tier 2 options see Tier 2 Facts.)
Can the OTECC’s HWM change?
Yes. The HWM can change, most notably for changes in the FBS. For instance, if a court requires a dam to be removed, BPA to spill more water for fish migration, less water is available to produce power. Both of these events would reduce OTECC’s HWM.
Why did BPA choose the HWM for future rate cases?
BPA believes this is the best way to ensure the Pacific Northwest has adequate
electric infrastructure to meet future economic and population growth. The needed
infrastructure is critical if the region is to avoid the extreme market volatility
that occurred during the power crisis of 2000-2001.
By defining what amount of power will be available at Tier 1 rates, BPA is providing
the clarity utilities and other resource developers need to make decisions about
developing and or acquiring new power resources.